Complete Bathroom Renovation with Floor Insulation

Total Area 10 m²
Rooms 1
Duration 10 days

The bathroom has been fully renovated, including the replacement of all wall and floor tiles, installation of new plumbing and drainage systems, and updating all electrical connections. Floor insulation has been installed prior to laying the new screed. A new shower area, vanity unit, and sanitary fixtures have been added. Waterproofing was completed according to industry standards, and all finishes were applied using high-quality, durable materials.

Find out the cost of repairs in 1 minute

1 2 3 4 5 6
Building Type

Type of Building

Total Area

Total Area (m²)

Total Rooms

Total Rooms

Type of Renovation

Type of Renovation

Planned Start Time

Planned Start Time

Summary & Contact Details

Contact Details

Do you want a discount?
Leave a request now and get a discount of up to 10%