Complete Bathroom Renovation with New Installations and Waterproofing

Total Area 7 m²
Rooms 1
Duration 10 days

The bathroom was fully renovated, including the replacement of all wall and floor tiles, the installation of new plumbing and drainage systems, and the renewal of all electrical connections. Floor insulation was applied before laying the new screed. A new shower area, vanity unit, and sanitary fixtures were installed. Waterproofing was carried out in accordance with current standards, and all finishing works were completed using high-quality, durable materials.