Rough renovation of a bathroom and a bathtub with hydromassage

Total Area 8 m²
Rooms 1
Duration 27 days

In this project we carried out a full rough renovation of a new-build bathroom. The work included:

  • Preparation and leveling of walls and floor.
  • Installation of waterproofing to ensure long-term protection.
  • Laying of plumbing and electrical lines according to the new layout.
  • Installation of a hydromassage bathtub with all necessary connections.
  • Base tiling and preparation for finishing layers.

The result is a fully prepared bathroom space with all technical work completed and ready for final decorative finishes. This stage ensures a reliable foundation for the client’s chosen design, while the installed hydromassage bathtub already brings comfort and functionality into the apartment.

Find out the cost of repairs in 1 minute

1 2 3 4 5 6
Building Type

Type of Building

Total Area

Total Area (m²)

Total Rooms

Total Rooms

Type of Renovation

Type of Renovation

Planned Start Time

Planned Start Time

Summary & Contact Details

Contact Details

Do you want a discount?
Leave a request now and get a discount of up to 10%